Creek Restoration in Ohio Helps Lake Erie Habitat, Golf Course Bottom Line

Project Summary: Stabilizing Ward Creek’s shoreline with native plants reduces erosion and sediment build-up in Lake Erie, while improving the golf experience (and revenue) at a local golf course.

Project Name: Lost Nation Golf Course Creek Stabilization

Reshaping Ward Creek’s banks reduced flooding on the golf course. Large stones along with
the new shape of the creek slowed the flow of water, reducing pollution into Lake Erie. Photo
courtesy of Chagrin River Watershed Partners.

Location: Willoughby, Ohio

 

Description:  Ward Creek travels through the suburbs of Cleveland, meeting up with the Chagrin River, which then flows into Lake Erie. Sediment picked up along Ward Creek and the Chagrin River makes its way into Lake Erie, degrading fish habitat. Nutrients in the runoff also contribute to pollution in the lake and an imbalance in the food chain. A portion of Ward Creek notorious for flooding and eroding its stream banks also happens to run through the Lost Nation Golf Course in Willoughby, Ohio. The erosion isn’t good for Lake Erie, but it was also very disruptive to the golf course, which in a typical year would lose as many as 6 days of play due to flooding and damage—hurting the golf course economically. With help from the Great Lakes Restoration Initiative, the Lost Nation Golf Course reshaped Ward Creek to slow water flow and reduce flooding. Native species were planted along the sides of the creek to help absorb water and reduce erosion. The changes have improved business for the Lost Nation Golf Course, with almost no playable days lost due to flooding.

 

Approximate cost of project: $286,000 from the Great Lakes Restoration Initiative

 

Resource challenge addressed: Erosion, sediment build-up, degradation of habitat

 

Newly planted vegetation thrives along the bank of Ward Creek. The low shrubs and grasses keep visibility high while also reducing runoff into the creek. Photo courtesy of Chagrin River Watershed Partners.

Key partners (public and private): TGC Engineering, Marks Construction. Ohio-based golf course architect Brian Huntley, Chagrin River Watershed Partners, the City of Willoughby, U.S. Environmental Protection Agency, U.S. Army Corps of Engineers, Ohio Environmental Protection Agency, and Lake County Soil and Water Conservation District

 

Types of jobs created: Heavy equipment operators, engineering firms, landscape architects, general laborers

 

Results and accomplishments: With the addition of native plants such as lizard tail, blue flag iris, spicebush, red buckeye, and bottlebrush, the slopes leading to Ward Creek are now covered in vegetation that slows and absorbs rainfall. Rising waters during rains are also prevented from deeply eroding the banks since these native plants and trees have deep roots to anchor the soil in place. In total, 2,900 linear feet of stream bank was stabilized and 3 acres along the creek through the golf course was replanted with native species. Species were chosen for the environment, but also to compliment the aesthetic of the golf course. As the creek flows through the back nine holes of the golf course, planting low vegetation capable of anchoring the soil was an important consideration, so as not to impede visibility during rounds of golf. Thanks to the Great Lakes Restoration Initiative, less sediment and runoff is entering nearby Lake Erie and golfers are less likely to be flooded out of the back nine.

Website: http://crwp.org/index.php/projects/restoration-projects-current/lngc-stream-resto

Originally published: May 26, 2017

Comments are closed.